XIA Haibang. Research and application of soluble bridge plug in Nanchuan shale gas field[J]. Petroleum Reservoir Evaluation and Development, 2019, (4): 79-82+88. DOI: 10.13809/j.cnki.cn32-1825/te.2019.04.015.
Research and application of soluble bridge plug in Nanchuan shale gas field
There are some problems of drilling composite bridge plug by coiled tubing in staged fracturing of shale gas horizontal wells
such as easy to get stuck
high frequency of strong magnetic fishing and long working hours. In order to solve these problems
deep analyses were carried out on the structure and dissolution principle of soluble bridge plug. And according to the key factors affecting the fracturing and dissolution performance of soluble bridge plug
field tests of soluble bridge plugs with different temperature resistance were carried out in Nanchuan shale gas field. The test results showed that the soluble bridge plugs could bear the differential pressure of 70 MPa under the temperature of 112 ℃. The soluble bridge plugs with heat resistance of 93 ℃ could be completely dissolved
while those with heat resistance of 120 ℃ could be partly dissolved. Compared with traditional composite bridge plug
the cost of a single well was reduced by 1.087 million Yuan. The main factors that affecting the fracturing and dissolution performance of soluble bridge plug were temperature
mineralization degree of solution and dissolution time. The higher the mineralization degree and the temperature were
the faster the dissolution rate of the soluble bridge plug would be. In particular
the well temperature was of great importance to the dissolution effect of soluble bridge plug. The feasibility and economy of soluble bridge plug in staged fracturing of shale gas wells were verified either
which was proved to have application value for cost reducing and efficiency increasing in fracturing of shale gas wells.