Calculation and application of bottom hole pressure buildup during shut-in period in high temperature and high pressure offshore gas well
- Issue 2, Pages: 41-46(2018)
Published:2018
DOI: 10.13809/j.cnki.cn32-1825/te.2018.02.007
移动端阅览

Published:2018
移动端阅览
相关文章
相关作者
相关机构