the well control in the drilling engineering design of onshore oil and gas wells mainly includes wellhead device
pressure test and well control requirements in conventional operation
and does not involve the calculation of the overflow quantity of shut-in. In this paper
kick tolerance is considered to be added to the design above
and a calculation method of kick tolerance is given. Combined with the drilling condition of ? 311.1 mm hole of well LJ-20 in gas field A in the Sichuan-Chongqing area
examples were applied to analyze how to add kick tolerance and assist the well control of overflow in drilling site. The calculation results showed that
with the giv
en
KI
value
the deeper the hole was
the smaller the kick tolerance would be; while at the same depth
the kick tolerance also decreased with the increase of the
KI
value. Therefore
it is necessary to add the kick tolerance to the design. Thus
whether the shut-in operation with overflow is safe or not can be effectively judged. At the same time
further considering should be given to how to obtain the dynamic kick tolerance of shut-in which is more applicable in the field
so as to assist in safe drilling in the deep formations where pressure is difficult to be predicted accurately.