ZHENG Lihui, XU Yandong, QIU Ziyao, et al. Quantitative analysis on drilling and completion loss factors by all data in Shunbei Oilfield[J]. Petroleum Reservoir Evaluation and Development, 2021, (4): 597-604. DOI: 10.13809/j.cnki.cn32-1825/te.2021.04.016.
Quantitative analysis on drilling and completion loss factors by all data in Shunbei Oilfield
The analytical method and other qualitative research methods to guide the field leakage prevention and plugging lack of pertinence. Meanwhile
the engineering data used by the quantitative prediction method in the prediction of leakage is incomplete and how to control the leakage quantitatively by adjusting the relevant parameters is not proposed after the loss degree is predicted. In or
der to solve the above problems
the cocoon stripping algorithm is proposed. Selecting all measurement parameters of 27 of 29 wells in Shunbei Oilfield with average loss rate recorded
and then taking the average loss rate as the objective function
the well depth and drilling and completion fluid density as the independent variables
the multiple linear regression equation is established
and the undetermined coefficients of the equation are solved. Theoretically
T test and F test are used to prove that the equation can meet the requirements of engineering analysis. In practice
the relative error between the calculated value and the actual value of two wells that did not participate in the equation establishment is about 6 %
proving that the equation meets the needs of engineering control. Finally
17 factors affecting the average loss rate have been screened out by the target equation simplified by the contribution rate method and the cutting element method
among which 10 drilling fluid factors contribute more than 50 %
indicating that a certain average loss rate could be controlled by adjusting the performance of drilling fluid. For the convenience of field control
the performance of drilling fluid is changed by the reading of six-speed viscometer at 300 r/min
so that the main controlling parameters of drilling fluid are reduced to two
which are pH value and the reading of six-speed viscometer at 300 r/min. The minimum average loss is predicted to be 2.3 m
3
/h through the analysis of the three-element equation. Considering the characteristics of Shunbei block
the leakage in Shunbei oilfield involves geological
engineering
and other operation links is found out through quantitative analysis
and so does the main controlling factors of drilling and completion leakage. By means of cutting elements
contribution rate and other methods
the minimum average leakage rate obtained by controlling the funnel viscosity and the reading of six-speed viscometer at 300 r/min is calculated. In the aspect
of guiding the field practice of plugging leakage
it can provide basic data support for the subsequent construction measures to obtain the ideal leak control effect
and provide an optional means for decision-making.