Practice of geology-engineering integration development of Shuaiduo Oilfield with complex fault in Subei Basin
Vol. 11, Issue 3, Pages: 377-383(2021)
Published:2021
DOI:
稿件说明:
移动端阅览
DOI:
TANG Jianxin, QIAN Kun, TANG Renxuan. Practice of geology-engineering integration development of Shuaiduo Oilfield with complex fault in Subei Basin[J]. Petroleum Reservoir Evaluation and Development, 2021, 11(3): 377-383.DOI:
Practice of geology-engineering integration development of Shuaiduo Oilfield with complex fault in Subei Basin
in Shuaiduo Oilfield in Subei Basin is a complex fault block reservoir with medium and high permeability. Both natural water and artifical water are used in the water flooding here. After put into production
some wells have high initial production
and rapid rise in water cut. The injected water bursts in one direction
and the difference in water absorption between layers is large. Some injection and production well groups on the plane have no response. The contradictions between the layers and the plane development are prominent. In view of the development
contradictions of different fault blocks and oil layers
the concept of geology-engineering integration has been introduced to strengthen the basic geological research
re-understand and implement the main structure
and then
formulate and implement intensification adjustment plans. The study of micro structure and remaining oil distribution is strengthened
and the injection-production well pattern is improved for the high water-cut fault blocks. At the same time
the research and application of a series of supporting technology such as water blocking and layered water injection suitable for Shuaiduo reservoir are also carried out. Due to the development and adjustment in recent years
the production of the oilfield keeps increasing and is stable. The annual output is above 6×10
4
t for eight consecutive years
the average annual output is 8.8×10
4
t
the oil recovery rate is 2.2 %
the average water cut rise rate is 2.33 %
the reserve controlled by water flooding reaches 366.2×10
4
t
the degree of water drive control is 86.7 %
the reserve for water drive is 363×10
4
t
and the degree of water drive is 86 %. The practical experience of the concept of geology-engineering integration in tapping the potential of remaining oil in the Shuiduo Oilfield has a good reference significance for other similar oil reservoirs.