Main progress and development direction of shale gas drilling and completion technologies in southeastern Chongqing
Vol. 11, Issue 3, Pages: 356-364(2021)
Published:2021
DOI:
稿件说明:
移动端阅览
DOI:
WANG Yanqi, HE Qing, LONG Zhiping. Main progress and development direction of shale gas drilling and completion technologies in southeastern Chongqing[J]. Petroleum Reservoir Evaluation and Development, 2021, 11(3): 356-364.DOI:
Main progress and development direction of shale gas drilling and completion technologies in southeastern Chongqing
Southeastern Chongqing is the first area to realize commercial development of shale gas in China. According to the main development progress of drilling and completion technologies in this area
10 key technologies are summarized
which are
casing program optimization
severe loss control in shallow layers
low-cost managed pressure drilling
well trajectory control based on geology-engineering integration
bit selection
oil-based drilling fluid with low oil-water ratio
ROP enhancement through drilling parameter optimization
cementing technology for leakage wells
completion technology for preventing trapped pressure in annulus
and factory-like drilling technology. In order to make up for the deficiency in drilling and completion technologies
six directions of further research are proposed
which are
drilling equipment automation
drilling parameter enhancement
water-based drilling fluid
complex situation treatment
small hole drilling and completion
and shale gas drilling with long horizontal section
which aim to improve the drilling and completion technologies and the exploration and development profits in southeastern Chongqing.